Name of the Project : Light Rail Transit (LRT) in South Sumatera (Metro Palembang)
Total Investment : Rp 12,500 Trillion
APBN-APBD Source : State Budget
Private Source :
Source Not Yet Determined :
Funding Scheme : State Budget
Location : Palembang, South Sumatera
Implementing Agency : Ministry of Transportation
Planned Construction Commencement Date : January 2016
Planned Commercial Operation Date : July 2018
Latest Status :
  • Work Contract was signed on 30 June 2016.
  • Technical Design and Specification Criteria have been determined through the Regulation of the Ministry of Transportation
  • A proposal for multi -year contract has been submitted to the Minister of Finance through a letter Number: KU.003/3/1/Phb.2016 dated 26 May 2016.
  • As of 27 June 2016 the Presidential Regulation Number 55 of 2016 on the amendment of Presidential Regulation Number 116 of 2015 on the acceleration of the organization ofintegrated Light Rail Transit / LRT in South Sumatera province.

Description of Project

One of the rail-based mass transportation modes which is environmentally friendly and integrated in South Sumatra Province.