A. PLTU Mulut Tambang Sumsel 8

Investment Value : IDR 210.8 Trillion
Funding Scheme : State-Owned Enterprice(SOE) and Private Financing
Location : South Sumatera
Project Owner : PT PLN
Target Construction Date : 2018
Commercial Operation Date : 2020
Project Status : contruction and will be operation in 2019

Project Description

South Sumatra Mine-Mouth Coal-Fired Power Plant 8 (PLTU Sumsel 8) is a coal- red power plant with ‘mine-mouth’ scheme where the power plant is located adjacent to the coal mine, thus reducing logistic costs. This PLTU will have 1,200 MW capacity and will be connected with HVDC transmission line.

Project Significance

The growth of population and industry on Java Island especially the west part of Java has increased the needs for electric power that cannot be fulfilled by power plants in Java Island. Seeing the huge potentials for coal and the construction of coal- red power plants on Sumatra Island, the Government of Indonesia has prepared a plan to develop power plants and transmissions to create sustainable electricity supply for both Sumatera and Java islands.