Name of the Project | : | Morowali Industrial Zone, Central Sulawesi |
Total Investment | : | – |
APBN-APBD Source | : | – |
Private Source | : | – |
Source Not Yet Determined | : | – |
Funding Scheme | : | PRIVATE |
Location | : | Morowali, Central Sulawesi |
Implementing Agency | : | Ministry of Industry |
Planned Construction Commencement Date | : | – |
Planned Commercial Operation Date | : | – |
Latest Status | : | Acquisition of 2000 Ha land has been completed. Two smelter plants with the capacity of 300.000 ton/year and 900.000 ton/year and two stainless steel with the capacity of 1 million ton/year and 2 million ton/year have been in operation Two Coal-Fired Plants (PLTU) with the capacity of 65×2 MW and 2×150 MW have been in operation Seaport has been built Clean Water Treatment has been installed A polytechnic and Stage I Innovation Centre have been built by Ministry of Industry Two towers of Vertical Housing (Rusunawa) for workers have been built by Ministry of Public Works and Public HousingMinistry of Industry has drawn up Detailed Spatial Planning (RDTR) in the vicinity of the industrial zone Ministry of Industry has trained 300 Human Resources of local industries |
Description of Project
The industrial zone focusing on Ferronickel will be built on 1.200 Ha land.