Name of the Project | : | Batulicin Industrial Zone, South Kalimantan |
Total Investment | : | – |
APBN-APBD Source | : | State Budget |
Private Source | : | – |
Source Not Yet Determined | : | – |
Funding Scheme | : | State Budget |
Location | : | Tanah Bumbu, South Kalimantan |
Implementing Agency | : | Head of Office of Regional Development Planning Board (Ka. Bappeda) of Tanah Bumbu District Head of Sub Directorate II Ministry of Industry |
Planned Construction Commencement Date | : | – |
Planned Commercial Operation Date | : | |
Latest Status | : | Has prepared a Masterplan document (2008), Strategic Planning of Industrial Zone Development (2012), and Innovation Study Center (2013), Detailed Engineering Design/DED (2015) and Detailed Spatial Planning/RDTR (2015). Process of establishment of industrial zone management body, process of formulating Environmental Impact Assessment and location of the project and spatial planning (RTRW) in Tanah Bumbu District Facilitating the relocation of local people living in a land near former industrial estates and Integrated Economic Development Zones ( Kapet), the target set is 6 months. Still finishing the land status in Batu Licin Industrial Zone between Tanah Bumbu District Administration (Pemkab) and South Kalimantan ProvinceDED on seaport development with the capacity of 3.000 adn 10.000 DWT in Tanah Bumbu has been designed to support KI Batulicin South Kalimantan Provincial Government has reached an agreement with Regional Administration of Tanah Bumbu in relation to land issue. Management board of Regional Government-Owned Enterprise (BUMD) has been established. |
Description of Project
Batulicin Industrial Zone, South Kalimantan Selatan will be built in an area of 789,73 Ha