{"id":8261,"date":"2017-07-11T02:56:02","date_gmt":"2017-07-11T02:56:02","guid":{"rendered":"https:\/\/kppip.go.id\/en\/?page_id=8261"},"modified":"2018-03-16T02:40:18","modified_gmt":"2018-03-16T02:40:18","slug":"drinking-water-supply-system-spam-regional-wasusokas","status":"publish","type":"page","link":"https:\/\/kppip.go.id\/en\/national-strategic-projects\/m-drinking-water-supply-project\/drinking-water-supply-system-spam-regional-wasusokas\/","title":{"rendered":"Drinking Water Supply System (SPAM)  Regional Wasusokas"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><div id=\"fws_6a0d6b121f1b7\" class=\"vc_row wpb_row vc_row-fluid  animate_onoffset row-dynamic-el standard_section     \" style=\"\" ><div  style=\"position: absolute;top: 0;\"><\/div><div class=\"container  dark\"><div class=\"section_clear\">\n\t<div class=\"vc_col-sm-12 wpb_column column_container \" style=\"\" data-animation=\"none\" data-delay=\"\">\n\t\t\t<div class=\"wpb_wrapper\">\n\t\t\t\t\n\t<div class=\"wpb_text_column wpb_content_element \">\n\t\t<div class=\"wpb_wrapper\" >\n\t\t\t<table class=\"table\">\n<tbody>\n<tr>\n<td><strong>Name of the Project<\/strong><\/td>\n<td>:<\/td>\n<td>Drinking Water Supply System (SPAM) Regional Wasusokas<\/td>\n<\/tr>\n<tr>\n<td><strong>Total Investment<\/strong><\/td>\n<td>:<\/td>\n<td>RP. 900 Billion<\/td>\n<\/tr>\n<tr>\n<td><strong>APBN-APBD Source<\/strong><\/td>\n<td>:<\/td>\n<td>State Budget, Regional Budget<\/td>\n<\/tr>\n<tr>\n<td><strong>Private Source<\/strong><\/td>\n<td>:<\/td>\n<td>&#8211;<\/td>\n<\/tr>\n<tr>\n<td><strong>Source Not Yet Determined <\/strong><\/td>\n<td>:<\/td>\n<td>&#8211;<\/td>\n<\/tr>\n<tr>\n<td><strong>Funding Scheme <\/strong><\/td>\n<td>:<\/td>\n<td>&#8211;<\/td>\n<\/tr>\n<tr>\n<td><strong>Location<\/strong><\/td>\n<td>:<\/td>\n<td>Wonogiri,&nbsp;Central Java<\/td>\n<\/tr>\n<tr>\n<td><strong>Implementing Agency<\/strong><\/td>\n<td>:<\/td>\n<td>Government of Central Java Province<\/td>\n<\/tr>\n<tr>\n<td><strong>Planned Construction Commencement Date <\/strong><\/td>\n<td>:<\/td>\n<td>December 2016<\/td>\n<\/tr>\n<tr>\n<td><strong>Planned Commercial Operation Date <\/strong><\/td>\n<td>:<\/td>\n<td>January&nbsp;2019<\/td>\n<\/tr>\n<tr>\n<td><strong>Latest Status <\/strong><\/td>\n<td>:<\/td>\n<td>\n<ol>\n<li>Funding allocation for unit production and Main Distribution Network which are the responsibility of Central and Regional Governments has met 60:40 portion. Agreement on the portion of funding between State Budget of Directorate General Cipta Karya and Regional Budget at Provincial level needs to be reached.<\/li>\n<li>Planning and Budgeting Information System (SIPPA) has not been issued as it is still waiting for the signing of Cooperaion Agreement (PKS), the PKS document is one of the requirements to propose SIPPA and Environmental Impact Assessment (AMDAL).<\/li>\n<li>Detailed Engineering Design (DED) review process for production unit and Main Distribution Network (JDU) have not been implemented by Regional Water Operator (PDAB) as they are still waiting for the signing of PKS as the basis for the PDAB to undertake review on DED<\/li>\n<\/ol>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n\n\t\t<\/div> \n\t<\/div> \n\t\t\t<\/div> \n\t<\/div> \n<\/div><\/div><\/div><div id=\"fws_6a0d6b121fbba\" class=\"vc_row wpb_row vc_row-fluid  animate_onoffset row-dynamic-el standard_section     \" style=\"\" ><div  style=\"position: absolute;top: 0;\"><\/div><div class=\"container  dark\"><div class=\"section_clear\">\n\t<div class=\"vc_col-sm-12 wpb_column column_container \" style=\"\" data-animation=\"none\" data-delay=\"\">\n\t\t\t<div class=\"wpb_wrapper\">\n\t\t\t\t<div class=\"wpb_content_element block_title column_title inner-simple \"><h2 class=\"h1\">Description of Project<\/h2><\/div>\n\t<div class=\"wpb_text_column wpb_content_element \">\n\t\t<div class=\"wpb_wrapper\" >\n\t\t\t<p>SPAM Regional Wasusokas a drinking water supply project which is planned by Government of Central Java Province with the output of&nbsp;1.450 Liter\/Second . its output passes through 2 stages: stage I : 750 l\/second &nbsp;and &nbsp;stage II : 700 l\/second.<\/p>\n\n\t\t<\/div> \n\t<\/div> \n\t\t\t<\/div> \n\t<\/div> \n<\/div><\/div><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"Name of the Project : Drinking Water Supply System (SPAM) Regional Wasusokas Total Investment : RP. 900 Billion APBN-APBD Source : State Budget, Regional Budget Private Source : - Source Not Yet Determined : - Funding Scheme : - Location : Wonogiri,&nbsp;Central Java Implementing Agency : Government of Central Java Province Planned Construction Commencement Date [...]","protected":false},"author":3,"featured_media":0,"parent":5199,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"_links":{"self":[{"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/pages\/8261"}],"collection":[{"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/comments?post=8261"}],"version-history":[{"count":1,"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/pages\/8261\/revisions"}],"predecessor-version":[{"id":8262,"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/pages\/8261\/revisions\/8262"}],"up":[{"embeddable":true,"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/pages\/5199"}],"wp:attachment":[{"href":"https:\/\/kppip.go.id\/en\/wp-json\/wp\/v2\/media?parent=8261"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}